Seattle Children’s – Perioperative Air Handler Unit and HVAC System Upgrades 

4800 Sand Point Way NE, Seattle, WA 98105

Spectrum provided full construction management and technical support for the replacement of the Mountain Perioperative suite Air Handler and HVAC system at Children’s Hospital main campus. 

The project included a full replacement of supply and exhaust mechanical units to create a fully redundant system integrated into the Hospital Building Automation System controls. Spectrum worked closely with the design team, Children’s the client’s facilities department, and the Perioperative operations team to complete the system replacement and upgrade while limiting operational impacts and operating room downtime. Detailed planning and collaboration with Children’s infection prevention and clinical operational team was critical to a successful start-up and integration of the new mechanical systems. 

    

The new system includes two air handler units running at 50,00 cfm each, allowing for full redundancy and seamless unit maintenance without disrupting operations. The new air handlers include UV light systems and internal HEPA filtration to eliminate airborne bacterial and viral contaminates from reaching the operating room suite.   

  • Owner/Client Seattle Children’s Hospital
  • Location Seattle, WA
  • Size 42,000 SF
  • Completion March 2022
  • Care Type Highest Acuity

Project Location

Contact

Interested in learning more?

This field is for validation purposes and should be left unchanged.
Orenda building exterior

Multifamily & Mixed-Use

Orenda at Othello Square

Building exterior with water and sunset in the background

Student Housing

Stateside

Ballard Food Bank exterior shot

Community Non-Profit

Ballard Food Bank

Reverb building exterior, view from corner with city in the background

Multifamily & Mixed-Use

Reverb

Meridian Center for Health building exterior with walking path

Healthcare

Meridian Center for Health

Burl rendering side angle

Multifamily & Mixed-Use

Burl